| 1. | New boundary bridge between lok ma chau and huanggang 落马洲至皇岗的新跨界桥 |
| 2. | Prequalified contractors invited for new boundary bridge 路政署为新跨界桥邀请经预先审定资格承建商 |
| 3. | New boundary bridge between lok ma chau and huanggang hy 2003 11 落马洲至皇岗的新跨界桥hy 2003 11 |
| 4. | Works for approach viaducts to new boundary bridge commenced 落马洲至皇岗新跨界桥的高架引道工程展开 |
| 5. | New boundary bridge between lok ma chau and huanggang hy 2003 11 updated 落马洲至皇岗的新跨界桥hy 2003 11只供英文版更新 |
| 6. | A 250m of dual 2 - lane approach viaduct leading to the proposed cross boundary bridge 兴建一条250米长的双程双线分隔高架引道连接新跨界桥 |
| 7. | The new boundary bridge between the sha tau kok and shatoujiao control points will be opened to traffic at 10am on the same day 沙头角口岸新跨界桥将于同日早上十时开放使用。 |
| 8. | Hy 2003 11 - design and construction of the approach viaduct to the new boundary bridge between lok ma chau and huanggang and associated works Hy 2003 11 -落马洲至皇岗新跨界桥的高架连接道路工程的设计及建造 |
| 9. | An environmental assessment , mainly on water quality and ecology , has also been carried out on the two proposed cross - boundary bridges 评估已为两条拟建跨界大桥展开一项环境评估,特别是水质及生态的评估。 |
| 10. | The new dual two - lane boundary bridge at lok ma chau runs side - by - side to the east of the existing dual two - lane boundary bridge 落马洲口岸的新跨界桥为双程双线分隔行车的公路桥,建于现有跨界桥的东侧,与它并排。 |